  • Construction of a plant for the production of ceramic tiles

    Construction of a plant for the production of ceramic tiles

    Sector: Industry
    Status: Scheduled

    Construction of the plant for the production of ceramic tiles in the territory Drozhzhanovsky District on the basis of clay deposits in the villages of Big Aqsa Mosque and the Old Kakerli quartz sand in the villages of the hose and Mottaki Ion.

    Jobs: 60-70

    The total project budget: 600,000,000 rubles.
    Required funding allocation: 1,000,000,000 rubles

    Location: Drozhzhanovsky municipal district, Matakskoe
    The demand for energy: gas — 1.6 million m³ per year, electricity — 81,000 MW per year, water — 30,000 m³ per year.

    Payback period: 3.5 years
    Productive capacity: 1,500,000 m² per year

    Organization: The Executive Committee of Drozhzhanovsky municipal district of the Republic of Tatarstan
  • Construction of a brick factory

    Construction of a brick factory

    Sector: Industry
    Status: Scheduled

    Construction of a brick factory in the territory Drozhzhanovsky District on the basis of clay deposits in the villages of Big Aqsa Mosque and the Old Kakerli.

    Jobs: 80-90

    The total project budget: 572,000,000 rubles
    Required funding allocation: 1,000,000,000 rubles

    Location: Drozhzhanovsky municipal district, Matakskoe.
    The demand for energy: gas — 25.3 million cubic meters per year, electricity — 38,053 MW per year, water — 15,600 m³ per year

    Payback period: 3.5 years
    Productive capacity: 60-80 million units per year

    Organization: The Executive Committee Drozhzhanovsky of the municipal district of the Republic of Tatarstan
  • Construction of the plant for the production of dry construction mixture

    Construction of the plant for the production of dry construction mixture

    Sector: Industry
    Status: Scheduled

    Construction of the plant for the production of dry building mixes in the territory of Drozhzhanovsky District based on Tatar Shatrashanskoe field zeolite-containing rocks, deposits of carbonate rocks in Tatarskaya Bezdna and Karakitais villages, and deposits of quartz sand and sand quarry on the basis of Shlanga-Matakskoe field. Expected volume of products is 1,700 tonnes of ready mix per month or 20,400 tonnes a year, representing 23% of the maximum capacity of the plant.

    Jobs: 80

    Location: Drozhzhanovsky municipal district, Matakskoe rural settlement.
    The demand for energy: gas — 4 million m³ per year, electricity — 2,125 MW per year,

    Payback period: 2.5 years
    Productive capacity: 106,080,000 rub per year

    Organization: The Executive Committee of the Drozhzhanovsky municipal district of the Republic of Tatarstan
  • Construction of a cement plant on the basis of deposits of carbonate rocks

    Construction of a cement plant on the basis of deposits of carbonate rocks

    Sector: Construction
    Status: Scheduled

    The basic idea of the investment proposal: Construction of a cement plant in Drozhzhanovsky District on the basis of deposits of carbonate rocks in Tatarskaya Bezdna and Karakitais villages. The first phase — 300 thousand tons of cement a year, with the subsequent rise in capacity with increasing consumption.

    Jobs: 130

    The total project budget: 3,149,000,000 rubles
    Location: Drozhzhanovsky municipal district, Matakskoe rural settlement

    The demand for energy: gas — 73.5 million cubic meters per year, electricity — 30,000 MW per year, water — 40,000 cubic meters per year.

    Payback period: 3.5 years
    Productive capacity: 2.5 billion rubles per year

    Organization: The Executive Committee of the Drozhzhanovsky municipal district of the Republic of Tatarstan
  • Construction of a dairy loose housing farm for 600 cows

    Construction of a dairy loose housing farm for 600 cows

    Sector: Agriculture
    Status: Under Implementation

    Jobs: 23

    The total project budget: 78,775.25 thousand rubles
    Required funding allocation: 59,085 thousand rubles

    Location: Yang-Aul village, district Vysokogorsky
    Area: 150,000 m²
    The demand for energy: gas

    Payback period: 8 years
    Productive capacity: 52,000,000 rubles per year

    Organization: "Tatmelioratsiya-Agro" LLC

Add a project

Please contact us, if you would like to offer investment projects or if you would like to become an Investor.

Contact us

Let us help you to choose a potential site for your investment project.

Insaf Galeev
Insaf Galeev

First Deputy Head of TIDA
Insaf.Galiev@tatar.ru

Or give us your details, and we will contact you as soon as possible.

Contact the Agency
© 2015 Cabinet of Ministers of the Republic of Tatarstan. In case of full or partial use of materials the reference is obligatory. Golden site
Next section Развитая инфраструктура

Thank you!

Your data otpralenny responsible officer will contact you within 24 hours