  • Creation of production of UAV for civil needs of monitoring the environmental situation of industrial infrastructure in the Arctic region

    Creation of production of UAV for civil needs of monitoring the environmental situation of industrial infrastructure in the Arctic region

    Sector: Industry
    Status: Scheduled

    Jobs: 100

    Total budget: 6 billion rubles
    The required amount of co-financing of 2.5 billion rubles.

    Location: Kazan
    Area: 10,000 m²
    The demand for energy: electricity, gas, water.

    The proposed volume of production and profitability of the project are calculated
    Payback period: 12 years

    Organization: JSC NPO "OKB. MP Simonova"
  • The revival of the Admiralty suburb

    The revival of the Admiralty suburb

    Sector: Culture
    Status: Scheduled

    Jobs: 6,600
    Total budget: 12 billion rubles

    Location: Admiralty settlement in the Kirov district of Kazan
    Area: 365.56 hectares

    The demand for energy: heat — 55 MW of electricity — 21,455 kW, gas — 659 520 m³ / year
    Organization: The Executive Committee of Kazan
  • Modernization of foundry

    Modernization of foundry

    Sector: Industry
    Status: Scheduled

    This project involves the introduction of energy-saving technologies, water recycling systems, auxiliary heating, modernization of foundry and machining equipment; Issue of innovative products. It is planned to manufacture complex shaped castings of aluminum alloys under high pressure, into a metal mold and the earth, as well as energy-saving LED lamps.

    Jobs: 30

    Planiruemyt investment: 191,732,000 rubles.
    The required amount of co-financing: 171,732,000 rubles.

    Location: Naberezhnye Chelny, Stroybaza district, Metallurgicheskaya str., 55
    Area: 1,208 m²
    The demand for energy: electricity — 12,940,000. KWh for the 2016-2021 period; consumption of thermal energy — 480 Gcal for the 2016-2021 period; gas consumption — 340,000 m³ for the 2016-2021 period.

    Estimated volume of production (Rubles / Year):
    2016 — 67,248,000 
    2017 — 143,744,000 
    2018 — 173,906,000 
    2019 — 250,361,000 
    2020 — 365,105,000 
    2021 — 454,247,000 

    Payback Period: simple — 4 years 4 months, discounted — 5 years 1 month
    Organization: “Naberezhnochelninsky LMZ” Magnolia" LLC
  • Engineering Center prototyping and industrial design in mechanical engineering

    Engineering Center prototyping and industrial design in mechanical engineering

    Sector: Industry
    Status: Scheduled

    Organization of the Center for prototyping and industrial design provide the ability to use high-tech production for the development and production of competitive high-tech products, and to work in the field of 3D-symmetry to ensure manufacturability of engineering, automotive, aircraft building and instrument-making industry.

    Jobs: 300

    The planned total budget of the project: 4,000,000,000 rubles.
    The required amount of co-financing: 4,000,000,000 rubles.

    Location: Naberezhnye Chelny, Academika Rubanenko str., 12, entrance 2, office 355.
    Area: 5,000 m²
    The demand for energy: electricity — 12.528 million kWh for the 2016-2022 period , Gas consumption —  1,260,000 m³ for the 2016-2022 period.

    Estimated volume of production (Rubles / Year):
    2016 — 194,400,000
    2017 — 388,800,000
    2018 — 583,200,000
    2019 — 777,600,000
    2020 — 972,000,000
    2021 — 972,000,000
    2022 — 972,000,000

    Payback Period: Simple — 5 years and 6 months, discounted — 6 years, 3 months

    Organization: Association of Mechanical Engineers of Naberezhnye Chelny and Kama region.
  • Construction of family entertainment and educational theme park “Volga Diskaveriz”

    Construction of family entertainment and educational theme park “Volga Diskaveriz”

    Sector: Tourism
    Status: Scheduled

    On the territory of Verhniy Uslon village is planned to build a family entertainment and educational theme park “Volga Diskaveriz” by analogy with the children’s theme park Futuroscope in Paris. According to the project the park will be located on an area of about 70 hectares and has a capacity of 5,600 people per day. In The park area there will be located 25 individual guest houses with pier for boats and yachts, the hotel complex for 500 guests, a variety of rides, a water park, interactive theater in the open air, and more. In addition to the location of the park plans to build a cable car, which connects the regional center of the capital.

    Jobs: 1,000

    Estimated Total Project Budget: 20,618,569,534 rubles.
    The required amount of co-financing: 120 million

    Location: Verkhneuslonsky municipal district, Upper Uslon.
    Area: 700,000 m²
    The demand for energy: drinking water supply — 1,279.2 m³ / day. (215.8 m³ / h); fire fighting — 12.5 m³ / day. (45 m³ / h, 135 l / s); rainwater drainage — 11,779.2 m³ / h (3,273.0 l / s); electric load 32,700 kVA (32,7MVt); thermal load Qt = 38.255 Gcal / h.

    Estimated production: 6,772,169,666.67 Rubles / Year
    Payback period: 8 years

    Organization: “Volga Diskaveriz”

Add a project

Please contact us, if you would like to offer investment projects or if you would like to become an Investor.

Contact us

Let us help you to choose a potential site for your investment project.

Ayrat Bikmukhametov
Ayrat Bikmukhametov

Deputy head of investor relations department
A.R.Bikmuhametov@tatar.ru

Or give us your details, and we will contact you as soon as possible.

Contact the Agency
© 2015 Cabinet of Ministers of the Republic of Tatarstan. In case of full or partial use of materials the reference is obligatory. Golden site
Next section Развитая инфраструктура

Thank you!

Your data otpralenny responsible officer will contact you within 24 hours